Jammu Sector, India

As part of India’s strategic border infrastructure development program, VRC Group is executing a large-scale public infrastructure project along the Indo–Pakistan International Border in the Jammu Sector. The project is aimed at strengthening defensive preparedness, enhancing operational mobility, and improving long-term structural resilience across sensitive border locations.
Executed under EPC Mode – Package IV (BOP Old Kana Check to BOP OP Chenab), the project covers comprehensive civil works, including earthen bund construction, metalled lateral roads, ditch systems, and Naka-cum-Machan fighting bunkers. The scope also integrates complete utility infrastructure such as water supply systems, sanitary installations, and internal electrical works across the districts of Jammu, Samba, and Kathua.
With an execution timeline of 27 months, the project demonstrates VRC Group’s expertise in delivering high-value government infrastructure under challenging terrain and high-security conditions.
The project involves the construction of a 135-feet earthen bundh along existing fencing across 179 km of the international border in the Jammu Sector.
The scope includes the development of lateral roads, protective embankments, slope stabilisation measures, filter media laying, and construction of defensive bunkers designed to enhance surveillance and operational readiness.
In addition to structural works, the project incorporates integrated utility services to ensure functional sustainability of the developed infrastructure.
Development of robust earthen bunds, reinforced embankments, and fighting bunkers to enhance security and defensive capability.
Construction of metalled lateral roads and ditch systems to ensure uninterrupted movement of security forces and equipment.
Provision of water supply, sanitary systems, and internal electrical installations to support operational continuity.
Execution of slope protection works and filter media laying to ensure durability and terrain stabilisation.
Name of the Project | Construction of 135 Feet Earthen Bundh, Metalled Road and Naka-cum-Machan Fighting Bunkers along Existing Fencing along 179 km of International Border in Jammu Sector (Indo–Pakistan Border) |
Name of the Client | Government Authority (Border Infrastructure) |
Starting Date | As per LOA (27.12.2025) |
Completion Date | 27 Months |
Work Executed By | VRC Group |
Location | District Jammu, Samba & Kathua – Jammu Sector, India |
Construction Cost (in INR) | ₹1,89,48,25,370.00 |
Segment | Infrastructure Development |
Sector | Government Construction / Public Infrastructure |